How often should SAE equipment be inspected and should it be labelled?

It should be maintained and inspected in line with the requirements of BS6037-1 as below:
a) pre-use checks carried out by the operator before commencing work each day or each shift;

b) inspections and maintenance, generally carried out at three-monthly intervals, with a more extensive inspection carried out generally at six-monthly intervals;

c) load testing carried out annually;

d) LOLER thorough examinations generally carried out at six-monthly intervals. The inspection reports should be maintained in a log on site. It is very common for systems to have a ‘Scafftag’ or similar system in place to help record details of service and testing dates etc but these would be a guide only and would not replace the relevant paperwork.